Engineering for Firewater Network Looping with DN350 Line
Engineering for Firewater Network Looping with DN350 Line
Project Description:
The project involves studies of the firefighting network looping from the existing DN300 header on the southeast side (A155 zone) to the existing DN350 header on the southwest side (A503 zone),
- installation of a new DN350 line approximately 540 meters long
- the installation of two new DN250 poles
- and the installation of the necessary shutoff valves
Owner: TotalEnergies.
Site: La Mède Platform.
Project scope of work:
- 3D laser scan for D350 line zone ( points cloud preparation and 3D model generation).
- Site survey and data gathering for firefighting network.
- 3D model for new DN350 line with Tie-ins connections.
- Isometric drawings extraction.
- Stress analysis report; CAESAR II software.
- Hydraulic studies for the whole network ( before and after looping); AFT Fathom software.
- Calculation note for foundations.
- Guide drawings for supports foundations.
- MTOs for piping, supports and civil works.
- Project estimate report (±10%).
Software used:
- AutoCAD Plant 3D.
- AutoCAD 2D.
- CAESAR II.
- AFT Fathom.